AUTEL connected a compressor to power supply
The public contract “Renewal of a compressor at Waterworks 3” issued by ENERGETIKA TŘINEC, a.s. was assigned to the PNEUKOM spol. s r.o. company, member of the VAE CONTROLS Group, a.s., to which AUTEL belongs as well.
AUTEL designed the electric part of the contract, completed the new electrical installation assembly, supplied and commissioned the heavy-current switchgears, systems for measurement and regulation, as well as automated control systems, and programmed the control system and visualisation for the purposes of compressor incorporation into the waterworks control system.
The project was completed at the end of March 2019.